Length of Soil sample L | = ________cm |
Diameter of Soil sample D | = _________cm |
Area of soil sample A | = _________cm 2 |
Area of stand pipe a | = _________cm 2 |
Sl.No | Initial Head (h1) cm | Final Head (h2) cm | Time t In seconds | k=((2.3×a×L)/(A×t))×log10(h1/h2) |
---|---|---|---|---|
1 | ||||
2 | ||||
3 | ||||
4 |